Building and facility management on a common database

Sub-measurement, technical operation, defects and building portfolio in a traceable operating model.

Typical starting points

We fix the operational question before the technology.

01

Separate BMS, measurement and fault ticket systems

BMS and meter integration on a manufacturer-independent data path

02

Incomparable on-site performance

Device, place, consumption and worksheet connection

03

Missing tool and maintenance history

Portfolio KPI and site breakdown

What and where is it worth measuring?

Building operation with common device and event history

BMS, consumption measurement, fault ticket and maintenance records often live in separate systems. As a result, the same device is registered under several names, and the story between the alarm and the worksheet is interrupted. The common tool, place and responsibility model makes it possible for a deviation to be a follow-up measure.

  • main and submeters, BMS data points, comfort and air quality values
  • operating hours, switching status and error code of mechanical equipment
  • building-level-room-device hierarchy with uniform identifiers
  • defect marks, planned maintenance, worksheet and material used
  • tenant or service provider liability and SLA deadlines
OrigSmart platform – Épületüzemeltetés közös eszköz- és eseménytörténettel
Building operation with common device and event history

Illustrative numerical example

An office building's air conditioner operates four unnecessary hours a day at night. If the average intake of 22 kW and 250 working days is only an illustrative assumption, the difference can be of the order of 22,000 kWh per year. The pilot's task is to compare the operating state and the electrical under-metering, and then verify whether the excess really disappeared after the time program was modified — without any loss of comfort.

The example is not an offer, a promise of savings or a general compliance requirement; the final technical solution is determined by the on-site and process survey.

Decision, audit and operational context

In the operational report, the measured fact, the calculated conclusion and the implemented intervention must be separated. In the case of several service providers, authorization and handover are also part of the process. It is not necessary to trigger the control of critical building automation: the platform can be connected to local systems as a monitoring and workflow layer.

How does that make an acceptable pilot?

At the start, we match the device IDs between the BMS, the measurement system and the maintenance register. You don't need to clean the entire portfolio at once: a building, a mechanical system and a recurring error type are enough to test the model. We determine which alarms will remain the tasks of local automation, which will become a central notification, and which require a worksheet. Upon acceptance, the measurement history, alarm, intervention and result must be traceable to the same device. This creates the basis for subsequent portfolio-level comparisons.

What does the pilot deliver?

  • uniform device and location identification
  • BMS-measurement-worksheet connection plan
  • alert responsibility matrix
  • measured intervention
  • portfolio expansion short list

What is included in the first step?

In the first phase, the following two areas will be inspected: main and submeters, BMS data points, comfort and air quality values, and operating hours, switching status and error codes of mechanical equipment. Connecting all sites, devices and historical data at the same time is not the goal. First, we verify that a reliable decision and a work process that can be closed are made from the selected data. To finalize the scope, two questions are particularly important: Which system owns the device and location identifiers? Which intervention remains exclusively in the local BMS? The answers determine the device count, integration task, local data storage, roles, and acceptance test.

Questions that we record on the survey

  • Which system owns device and location identifiers?
  • Which alerts require a worksheet and which are just informational?
  • How do we measure SLA and recurring errors?
  • Which intervention remains exclusively in the local BMS?

Related content

Related industry solutions

Municipal energy monitoring and DIMOP-based digitization — OrigSmartIndustrial IoT and manufacturing energy monitoring — OrigSmart
First 90 days

Measurable pilot, evidence-based next step.

1–15. sun

Site assessment

Locations, data sources, responsible persons and success criteria.

16–45. sun

Connection

Controlled connection of designated measurement points and systems.

46–75. sun

Process

Dashboard, alert and at least one actionable workflow.

76–90. sun

Evaluation

Result, list of deficiencies and quantifiable expansion proposal.

What do you get at the end of the pilot?

  • Documented data source and connection map
  • Working limited pilot environment
  • Coordinated alert and liability process
  • Measurement result and decision summary
  • The basis for the technical and budget of the next phase

The first step is not a complete system introduction.

During a short technical consultation, we select the measurement or operating point at which the value of the pilot can be checked.

Pilot consultation